Education

INTERZINC 315 PDF

Interzinc B. Storage Conditions: All painting materials shall be stored in a clean, dry, well ventilated place, protected from sparks, flame. A three component, metallic, zinc rich epoxy primer which passes Slip B coefficient. Interzinc B complies with SSPC Paint 20 and contains minimum 80%. Interzinc Call for Price. A two component high solids, low VOC metallic zinc- rich epoxy primer formulated on proprietary polymer technology which provides.

Author: Kajiran Tojataxe
Country: Tunisia
Language: English (Spanish)
Genre: Finance
Published (Last): 11 August 2009
Pages: 467
PDF File Size: 5.73 Mb
ePub File Size: 1.73 Mb
ISBN: 164-8-94832-647-7
Downloads: 78202
Price: Free* [*Free Regsitration Required]
Uploader: Akinos

Where necessary, cleaning or other interiznc of the surfaces to receive coatings are the responsibility of the intwrzinc of the incompatible substrate. Mild Atmosphere Applications- Urban and industrial atmospheres. Primer applied off site must be in accordance with the provisions of Section Regional Materials- 20 percent extracted, processed and manufactured regionally: Before proceeding with the work, the applicator will apply the primer and finish coat to a representative substrate section of square feet in size.

Moderate Atmosphere Applications – Industrial and coastal areas. Provide ventilation in areas to receive work of this section during application and minimum 24 hours after application. Verify that substrate and workspace inherzinc and humidity conditions are in accordance with requirements of this section. Substrate and air temperature shall be in accordance with the manufacturers requirements.

Temperature and Humidity Requirements: The relative humidity of the application area shall not exceed a maximum of 85 percent for 24 hours prior, during and inherzinc hours after the application of the material.

For each finish product specified, two complete sets of color chips representing manufacturer’s full range of available materials. Coordinate with Section and Contract Drawings for all Moderate Atmosphere areas of the project.

For each finish product specified, two samples representing actual product, color, and finish. Commencement of application is acceptance inteezinc substrate.

  CRASHKURS WELTWIRTSCHAFTSKRISE ODER JAHRHUNDERTCHANCE PDF

Pipes, ducts, conduits, hangers and supports, equipment, and equipment enclosures exposed to view in all rooms and spaces.

The application must be witnessed by the Architect’s or Owner’s representative and is subject to their approval. Requests for substitutions must be made 30 days prior to submittal and contain the full name of each product, descriptive literature, testing data collected from industry consensus standard testing, data on past performance, manufacturer’s instruction for use and generic type.

Interzinc B – A k i r a

Equipment and application procedures must conform to the coating manufacturer’s application instructions. When deciding on the extent of the mock-up, consider all the major different types of work on the project.

Structural steel and framing with reference to primer receiving fire protection materials. At project closeout, provide to Owner or Owners Representative an executed copy of the manufacturer’s standard limited warranty against manufacturing defect, outlining its terms, conditions, and exclusions from coverage.

International Protective Coatings is the leading supplier of high performance Protective Coatings and forms part of Akzo Nobel, a market driven, technology based company specializing interinc Coatings, Chemicals and Pharmaceuticals.

Items specified or provided with factory finish; materials and products having factory-applied primer are not considered factory finished. Provide masking, drop cloths or other suitable coverings to prevent overspray onto surfaces not intended to be affected by Work in this section.

Interzinc 315

Interior environment with high humidity and exposure to air pollution. Coating will be a complete system from a single source consisting of primer and topcoat. Pipes, ducts, conduits, hangers and supports, equipment, and equipment enclosures exposed to view in all rooms and spaces except mechanical rooms, electrical rooms, and utility rooms.

To be selected by Architect from manufacturer’s full range of available colors. Do not commence application of coatings until the contractor, applicator and inspector have examined the surfaces inteezinc receive Work in this section, interzimc determined that the surfaces are acceptable to receive the specified materials. Delete the next paragraph if not applicable. Areas will be designated by the Architect. Submit manufacturer documentation that the fireproofing product interzzinc with the specified contract requirements.

  KRALL TRIVELPIECE PRINCIPLES OF PLASMA PHYSICS PDF

Upon completion of installation, all excess material, overspray and debris must be cleared and removed from the job site.

SECTION HIGH PERFORMANCE SPECIALTY COATINGS

If this location falls within a mile radius of the project site, then Interchar can contribute to earning Materials and Resources Credit 5. Provide primer cut back areas a minimum three 3 inches 76mm from bolted connections and minimum twelve 12 inches mm from welded connections.

The following is one example of how a mock-up on a large project might be specified. International Paint has operations in 54 countries worldwide and over 3, employees. No coating material may be procured or delivered to the project site prior to the review and acceptance of the proposed materials by the Architect in writing.

Information must demonstrate equivalence of product and performance to the specified material and intezrinc systems. This section is based on the products of International Protective Coatings, which is located at:.

Interzinc 315B

Moderate sulpher diuoxide levels. If necessary for job schedule, the General Contractor shall provide enclosures and heat to maintain proper temperatures and humidity levels in the application areas.

All batch number, product identification and quantities shall be recorded on appropriate QC documents. Protect work area from windblown dust and rain. Do not proceed with remaining work until workmanship, color, and sheen are approved by Architect.

Back To Top